Keynesian Technology

Analysis of the Jante’s Law Process and Proof of Conjecture: Coupling Y (⋅) and Z(⋅) | HackerNoon

Authors: (1) Edward Crane, School of Mathematics, University of Bristol, BS8 1TH, UK; (2) Stanislav Volkov, Centre for Mathematical Sciences, Lund University, Box 118 SE-22100, Lund, Sweden. Table of Links Abstract and Introduction Preliminaries Reduction to the case of uniform geometry All original points are eventually removed, a. s. Proof of Theorem 1 Coupling Y (⋅) and Z(⋅) Acknowledgements and References Appendix 6 Coupling Y (⋅) and Z(⋅) In this section, we complete the proof

Read More »

Analysis of the Jante’s Law Process and Proof of Conjecture: Proof of Theorem 1 | HackerNoon

Authors: (1) Edward Crane, School of Mathematics, University of Bristol, BS8 1TH, UK; (2) Stanislav Volkov, Centre for Mathematical Sciences, Lund University, Box 118 SE-22100, Lund, Sweden. Table of Links Abstract and Introduction Preliminaries Reduction to the case of uniform geometry All original points are eventually removed, a. s. Proof of Theorem 1 Coupling Y (⋅) and Z(⋅) Acknowledgements and References Appendix 5 Proof of Theorem 1 Without loss of generality, we assume that the

Read More »
Software

Theory Coherent Shrinkage of Time Varying Parameters in VARs: Conclusion and References | HackerNoon

Andrea Renzetti, Department of Economics, Alma Mater Studiorium Universit`a di Bologna, Piazza Scaravilli 2, 40126 Bologna, Italy. Table of Links Abstract and Introduction Theory coherent TVP-VAR Forecasting with the TC-TVP-VAR Response analysis at the ZLB with the TC-TVP-VAR Conclusion and References A Appendix 5 Conclusion TVP-VAR are flexible statistical models used both for prediction and policy analysis in macroeconomics. Despite their flexibility allows to capture changes in the dynamic relationship among the macroeconomic variables, these

Read More »

Theory Coherent Shrinkage of Time Varying Parameters in VARs: Analysis at the ZLB | HackerNoon

Andrea Renzetti, Department of Economics, Alma Mater Studiorium Universit`a di Bologna, Piazza Scaravilli 2, 40126 Bologna, Italy. Table of Links Abstract and Introduction Theory coherent TVP-VAR Forecasting with the TC-TVP-VAR Response analysis at the ZLB with the TC-TVP-VAR Conclusion and References A Appendix 4 Response analysis at the ZLB with the TC-TVP-VAR TVP-VAR are extensively used in applied research not only to make forecasts, but also to infer changes in the response of the economy

Read More »
Software

The Contribution of Us Broadband Infrastructure to GDP: Acknowledgements & References | HackerNoon

Authors: (1) Matthew Sprintson (2) Edward Oughton Table of Links Abstract and Introduction 2. Literature Review 2.1 Reviewing Broadband Infrastructure’s Impact on the Economy 2.2 Previous Research into IO Modeling of Broadband Investment 2.3 Context of the Bipartisan Infrastructure Act through Previous Research 3. Methods and 3.1 Leontief Input-Output (IO) Modeling 3.2 Ghosh Supply-Side Assessment Methods for Infrastructure 3.3 Data and Application 4. Results and 4.1 To what extent does the Bipartisan Infrastructure Law allocate

Read More »

How Broadband Subsidies Affect the Economy: Data and Application of Economic Modeling Techniques | HackerNoon

Authors: (1) Matthew Sprintson (2) Edward Oughton Table of Links Abstract and Introduction 2. Literature Review 2.1 Reviewing Broadband Infrastructure’s Impact on the Economy 2.2 Previous Research into IO Modeling of Broadband Investment 2.3 Context of the Bipartisan Infrastructure Act through Previous Research 3. Methods and 3.1 Leontief Input-Output (IO) Modeling 3.2 Ghosh Supply-Side Assessment Methods for Infrastructure 3.3 Data and Application 4. Results and 4.1 To what extent does the Bipartisan Infrastructure Law allocate

Read More »

Understanding Ghosh Supply-Side Methods for Evaluating Infrastructure Impact | HackerNoon

Authors: (1) Matthew Sprintson (2) Edward Oughton Table of Links Abstract and Introduction 2. Literature Review 2.1 Reviewing Broadband Infrastructure’s Impact on the Economy 2.2 Previous Research into IO Modeling of Broadband Investment 2.3 Context of the Bipartisan Infrastructure Act through Previous Research 3. Methods and 3.1 Leontief Input-Output (IO) Modeling 3.2 Ghosh Supply-Side Assessment Methods for Infrastructure 3.3 Data and Application 4. Results and 4.1 To what extent does the Bipartisan Infrastructure Law allocate

Read More »

Understanding Leontief Input-Output Modeling in Infrastructure Economics | HackerNoon

Authors: (1) Matthew Sprintson (2) Edward Oughton Table of Links Abstract and Introduction 2. Literature Review 2.1 Reviewing Broadband Infrastructure’s Impact on the Economy 2.2 Previous Research into IO Modeling of Broadband Investment 2.3 Context of the Bipartisan Infrastructure Act through Previous Research 3. Methods and 3.1 Leontief Input-Output (IO) Modeling 3.2 Ghosh Supply-Side Assessment Methods for Infrastructure 3.3 Data and Application 4. Results and 4.1 To what extent does the Bipartisan Infrastructure Law allocate

Read More »